WHAT WE DO

Design. Build. Run. You keep everything.

Four stages, one continuous thread — from the first workshop to the 3am page that never comes. Every claim on this page sits next to the artifact, the number, or the name that proves it.

Projects shipped

50+

Projects shipped

Data points / day operated

10B+

Data points / day operated

Certified · 2022

ISO 27001

Certified · 2022

Advanced Tier partner

AWS

Advanced Tier partner

Movement 01 — DESIGN

Design the right thing.

Evidence, then shape. The expensive mistakes die here, cheaply — sometimes the honest output is "don't build it."

Stage 01 / 04

Are we building the right thing?

We turn broad ambition into a decision you can defend: priorities, risks, and the first measurable bets — in writing.

  • Decision document
  • Opportunity map
  • Stakeholder map
  • Maturity snapshot
Inside Discover

Stage 02 / 04

What exactly do we build first?

We turn the chosen bet into a build-ready shape: scope, success criteria, prototype evidence, and a plan engineering can commit to.

  • Product brief
  • Working prototype
  • Service blueprint
  • Delivery roadmap
Inside Define

Movement 02 — BUILD

Build it well.

A named squad ships working software on a rhythm you can watch — architecture, quality, and security in the build, not bolted on.

Stage 03 / 04

Is it being built well — and can I see it?

A named cross-functional squad ships working increments on a reliable rhythm — architecture, quality, and security in the build, not bolted on.

  • System architecture
  • Decision records
  • Delivery telemetry
  • Test & release strategy
Inside Develop

Movement 03 — RUN

Run it for years.

SLAs, runbooks, on-call. Most consultancies stop at launch — the run is where we differ, and where the proof lives.

Stage 04 / 04

Will it run for years?

From release to reliability: we operate to SLA, publish the runbooks, and hand over when you are ready — or keep running it.

  • Runbooks
  • Incident record
  • Observability dashboard
  • Handover checklist
Inside Deliver

VS. TYPICAL

Synergi vs. typical engagement.A six-row schema we’ll come back to.

Discovery depth

2–4 week shaped sprint, written-up
Free pre-sales workshop, pitch-deck output

Team composition

Cross-border, named, no sub-contractors
Mixed onshore/offshore, rotating staff

Tech ownership

You own the IP, source, infrastructure
Lock-in via proprietary middleware

Compliance posture

ISO 27001 · GDPR · audit-ready by default
Compliance retrofitted at certification time

Run / handover

Operate to SLA, then transfer with runbooks
Ship-and-vanish, or perpetual rev-share

AI guardrails

Synergi AI Charter, ten written principles
Vendor's vendor's policy, link-in-footer

HOW TO START

Three ways to buy. All of them reversible.

The page procurement actually needs. Start small, own everything, scale only when the evidence says so.

Model 01

Sprint

  • 2–6 weeks
  • Fixed scope, fixed price

Discovery sprint, definition sprint, or technical due diligence. A written deliverable with a decision inside it — the lowest-risk way to find out how we work.

Every sprint output is yours, whoever you build with.

Model 02

Embedded team

  • Quarterly
  • Named squad, fully accountable

A cross-functional team inside your organization and your tools. Open sprint reviews, published telemetry, decisions recorded as they happen.

Your repo, your cloud, your IP — from the first commit.

Model 03

Build & run

  • Multi-year
  • SLA-backed operation

We deliver the system, then operate it: on-call, observability, security, cost. Handover is rehearsed and yours to call — or we keep running it.

Runbooks published from day one. You are never hostage.

PROOF, NOT PROMISES

Three engagements, zero adjectives.

ENERGY · IOT

10B+ data points a day — operated for a European energy group.

10B+

data points / day

INSURANCE · PLATFORM

Multi-market insurance platform — riskiest flows user-tested by week four.

Wk 4

riskiest flows user-tested by

INDUSTRIAL · CONNECTED PRODUCTS

Quarterly to weekly releases in 90 days — for an industrial manufacturer.

90 days

from quarterly to weekly

NEXT STEP

Bring the hard problem.

The legacy rebuild, the AI bet, the platform that has to last. A sprint is the lowest-risk way to find out how we work — and the output is yours either way.

or write to hello@synergi.com